Ram's Fall Motorist's Review

Nov 07, 2020 at 09:51 am by WGNS


(MURFREESBORO)  The fall colors are increasing the number of strollers along the Greenway and making residents more inclined to drive around and enjoy the beauty of the season. Murfreesboro Transportation Department's Deputy Director Ram Balachandran warns of contruction projects that might get in your way from today through November 14, 2020. 

City Construction Projects 

Right Turn Lane Improvement Work (Robert Rose Dr at Thompson Ln)

Expected Lane Closures:  Monday through Friday, 9:00 am to 3:00 pm:  Contractor for the City of Murfreesboro will be making right turn lane improvements on Robert Rose Dr at Thompson Ln.  Traffic signal modification work continues.  Appropriate traffic controls will be in place.

 

Underground Utility Installation Work (Sulphur Springs Rd at Northfield Blvd)

Expected Lane Closures:  Monday through Friday, 8:30 am to 4:00 pm:  Contractor for a private development will be performing underground utility work on Sulphur Spring Rd.  Appropriate traffic controls will be in place. 

 

Highland Ave Utility Installation Work (between E College St and E Main St)

Expected Lane Closures:  Monday through Friday, 8:30 am to 3:30 pm:  Water Resources Department crews will be performing utility installation work on Highland Ave between E College St and E Main St.  The segment of Highland Ave will be closed.  Access to local residents will be kept open.  Appropriate traffic controls and detours will be in place.

 

Shores Road Realignment Work (Shores Road between Westlawn Blvd and Veterans Pkwy)

Expected Road Closures:  Monday, November 2 through Monday, November 16:  Contractor for a private development will be realigning Shores Rd between Westlawn Blvd and Veterans Pkwy.  Traffic to and from Veterans Pkwy will be detoured onto Westlawn Blvd.  Appropriate detour signs and traffic controls will be in place.

 

Underground Utility Work (N Tennessee Blvd just south of Hazelwood Dr)

Expected Lane Closures:  Tuesday through Thursday, 8:30 am to 3:30 pm:  Contractor for Atmos Inc, will be installing gas lines along N Tennessee Blvd just south of Hazelwood Dr.  There will be lane closures and traffic interruptions.  Appropriate traffic controls will be in place. 

 

Annual City Street Paving Projects

Expected Lane Closures:  Monday through Friday, 9:00 AM – 3:00 PM:  City contractor will be performing construction work at the following streets:

  1. Sulphur Springs Rd between St Johns and Breckenridge Dr, Summit Ct, York Ct and Park Cir (Milling & paving work)
  2. Thompson Ln and Garcia Blvd (Sidewalk maintenance work)
  3. Bridge Ave between Old Fort Pkwy and New Salem Hwy (ADA improvements)
  4. Academy St (utility pothole)

Expect lane shifts and traffic interruptions.  Appropriate traffic controls will be in place.

 

TDOT Resurfacing Projects

RUTHERFORD COUNTY, I-24 SMART Corridor

RUTHERFORD COUNTY, The construction of pedestrian facilities on SR 10 Memorial Blvd from DeJarnette Ln to Thompson Ln in Murfreesboro

RUTHERFORD COUNTY, SR 99 (New Salem Hwy) resurfacing from Cason Lane to I-24

RUTHERFORD COUNTY, Overhead Sign Replacement on I-24

 

Source: TDOT

 

Sections: News