Ram's Chilling Road Report

  Email   Print

(MURFREESBORO) Periods of sunshine is nice, but temps are less than thrilling, and motorists travel where shivering construction crews are chilling--so said Assistant Traffic Director Ram Balachandran as he gave is "road forecast" for today through February 29, 2020.

City Construction Projects

Underground Fiber Optics Installation Work (Williams Dr and Kennedy Dr)

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for a private utility company will installing underground fiber optic lines. There will be lane closures and traffic interruptions. Appropriate traffic controls will be in place.

ADVERTISEMENT



Utility Installation Work at E McKnight Dr and N Maple St

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for a private development will be doing utility installation work. There will be partial lane closures and traffic shifts. Appropriate traffic controls will be in place.

ADVERTISEMENT



Right Turn Lane Improvement Work (Old Fort Pkwy at Gresham Ln)

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for a private development will be performing right turn lane improvements on Old Fort Pkwy at Gresham Ln. There will be lane closures and minor traffic interruptions. Appropriate traffic controls will be in place.

Right Turn Lane Improvement Work (Robert Rose Dr at Thompson Ln)

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for a private development will be doing right turn lane improvements on Robert Rose Dr at Thompson Ln. There will be lane closures and minor traffic interruptions. Appropriate traffic controls will be in place.

Utility Installation Work at City View Dr between E Main St and Alumni Dr

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for MTSU will be doing utility installation work. City View Dr will be closed to through traffic just south of Alumni Dr. Driveway to the residents will be kept open. Appropriate traffic controls will be in place.

Annual City Street Paving Projects

Expected Lane Closures: Monday through Friday, 9:00 AM - 3:00 PM: City paving contractor will installing HC ramps at the following streets:

  1. Highland Ave at Bell St
  2. Highland Ave at Burton St

Expect lane shifts and traffic interruptions. Appropriate traffic controls will be in place.

TDOT Resurfacing Projects

RUTHERFORD COUNTY, The grading, drainage, construction of bridges, signals and paving on SR 99 from Cason Lane (L.M. 15.97 to I-24 in Murfreesboro (L.M. 18.12)

  • Daily, 9AM-4PM, There will be flagging operations in both directions for equipment crossing as needed.

RUTHERFORD COUNTY, I-24 SMART Corridor

  • Daily, 9AM-3PM, There will be a lane closure as needed between MM 79-80 for sign foundation work.

Source: TDOT

Read more from:
News
Tags: 
Assistant Traffic Director, Murfreesboro, Ram Balachandran, road report, WGNS
Share: 
  Email   Print
Related Articles
Powered by Bondware
News Publishing Software

The browser you are using is outdated!

You may not be getting all you can out of your browsing experience
and may be open to security risks!

Consider upgrading to the latest version of your browser or choose on below: