City Traffic Engineer Ram Balachandran again looks into his crystal ball and warns 'Boro motorists of potential trouble spots for September 18th through the 24th.
City Construction Projects
Manson Pike/Fortress Blvd Realignment Project
ExpectedLaneClosures: Monday – Tuesday, 9:00 AM to 3:00PM: Contractor will continue paving the middle section of the new Fortress Blvd at I-24. Traffic coming from Medical Center Parkway will be shifted to the north while paving the middle section. There will be lane closures and traffic interruptions
Maney Avenue Street Improvement Project (between SE Broad Street and College Street)
Expected Road Closures: Tuesday through Friday, 8 AM to 4:00 PM: Road construction work continues along Maney Avenue between Broad Street and E Castle St. This section is closed to through traffic including the intersection of Maney Avenue and Castle Street. Access drives to the local residents and businesses will be kept open at all times.Motorists are advised to use Highland Ave and Academy Street travelling north/south and State Street and Vine Street travelling east/west. Work continues with road closures
Lytle Creek Sewer Replacement Project (Intersection of Hickerson Drive and West Castle Street)
Expected Lane Closures: Monday - Thursday: South Walnut from West Castle to the dead end section will be paved and open to traffic. Final surfacing will be done at a later time. Detour signs will be in-place.Work has begun on both sides of S. Church Street near Lytle Creek.Work continues, minor traffic interruptions.
AT&T Fiber Optic Project (Broad Street between Middle Tennessee and Academy St)
Expected NO Lane Closures: Monday – Friday, 9:00 AM to 3:00 PM: The contractor for AT&T will be installing underground fiber optic cables along the east side of Broad Street. There will be no lane closures. All work will be done off-street with minor interruptions at driveway entrances and exits.Work continues, minor traffic interruptions.
Veterans Pkwy (New section between Barfield Road/Kimbro Road and Barfield Crescent Road)
Expected Lane Closures: Monday – Friday, 9:00 AM to 3:00 PM: The contractor will be installing storm drain across Barfield Road at the intersection of Kimbro Road. Clearing and grubbing work continues off the street between Barfield Road and Barfield Crescent Road. There will be lane closuresat the intersection of Barfield Road and Kimbro Road.The traffic on Barfield Road will be controlled by stop signs. There will be flagman during the day managing the traffic.
Sewer Improvement Project (Front Street between Main Street and Broad Street)
Expected Road Closures: Monday through Friday, 8 AM to 3:00 PM: Sewer improvement work will be performed on Front Street between Main Street and Broad Street. There will be partial road closure and traffic interruptionson Front Street. Access to local businesses will be kept open. Road will be closed to through traffic. Appropriate traffic controls will be in place.
MTSU Phase 3 Project (Intersection of Greenland Drive at Wiles Ct)
Expected Lane Closures: Monday through Friday, 9 AM to 2:00 PM: There will be partial lane closures on Greenland Drive at Wiles Court. The contractor will be installing underground utilities.
TDOT Re-Paving Project (Old Fort Pkwy between Cason Lane and NW Broad Street)
Expected LaneClosures: Monday through Friday, 8:00 PM to 5:00 AM: The contractor for TDOT will be milling and re-paving Old Fort Pkwy between Cason Lane and NW Broad Street. Milling work will begin Monday night on Old Fort Pkwy at NW Broad Street moving west to Cason Lane. There will be lane closures and traffic interruptions.All milling and paving work will be done at night.
Annual City Street Paving Project
Expected Lane Closures: Tuesday through Friday, 8:30 AM – 4:00 PM: Citymilling crew and paving will working on the following streets: Expect lane shifts and traffic interruptions during these operations.
Paving WorkContinues at:
Brewster Ct between Brentmeade Drive to cul-de-sac
Overhill Ct between Brentmeade Drive to cul-de-sac
Overhill Ct between Brentmeade Drive and Vinemont Drive
Vinemont Drive between the joint to Gatherhill Drive
Thetahill Road between Vinemont Drive and Roellen Road
Roellen Road between Thetahill Road and Braxton Drive
Kirley Ct between Roellen Road to cul-de-sac
Hamblen Ct between Roellen Road to cul-de-sac
Gatherhill Drive between Roellen Road and Vinemont Drive
Trenton Ct between Roellen Road to cul-de-sac
Meadowridge Ct between Brentmeade Drive to cul-de-sac
Yorkshire Ct between Brentmeade Drive to cul-de-sac
Yorkshire Ct between Brentmeade Drive to dead end
Brentmeade Drive between Madison Ave to the joint at Memorial Blvd
Milling WorkContinues at:
Pennington Drive between Thompson Lane and Wallace Drive
Wallace Drive between Pennington Drive and Cul-de-sac
Bridget Drive between Sulphur Springs Road and Chanda Lane
Chanda Lane between Bridget Drive and Pennington Drive
Claire Court between Chanda Lane and Cul-de-sac
Chad Court between Bridget Drive and Cul-de-Sac
Jay Court between Bridget Drive and Cul-de-Sac
Lewis Circle between Pennington Drive and Cul-de-Sac
Rob Circle between Pennington Drive and Cul-de-sac