Audio Play/Pause Button Listen Live

Ram's Road Warnings: Now through January 19th

Jan 12, 2013 at 10:53 am by Bryan Barrett


As the winter weather becomes more unpredicatable, so do the traffic problems created by work crews. City Trafic Engineer Ram Balachandran points out the handful of places that might ceate "motorist challanges" now through January 19th. 

City Construction Projects

ADVERTISEMENT

Bradyville Pike Road Survey Work (between Broad Street and Rutherford Blvd)

Expected NO Lane Closures: Wednesday through Friday, 8:00 AM – 4:00 PM: Surveying crews will be working along Bradyville Pike between Broad Street and Rutherford Blvd. There will be no lane closures. Appropriate traffic controls will be in-place.

Murfreesboro Urban Environmental Landscape Maintenance Project (Central Business District)

ExpectedNO LaneClosures; Contractor for City of Murfreesboro Urban Environmental Department will be planting trees around the central business district and the public square. There will be minor traffic interruptions. Appropriate traffic controls will be in-place.

Murfreesboro Water & Sewer Project (S Baird Lane between E Main Street and E Castle Street)

Expected Lane Closures: Monday - Friday: 8:30 AM to 2:30 PM: The contractor for the Water and Sewer Department will be replacing sanitary sewer pipe on S Baird Lane (north to south) between E Main Street and E Castle Street. S Baird Lane will be closed to through traffic. Driveway access to local residents will be kept open at all times. Appropriate traffic controlswill be in place.

Sections: News