Murfreesboro, TN - Schools are back in session, college students are returning, and the traffic is back in full swing. Murfreesboro Transportation Department's Andrew Royalty checked filings from all construction crews and has compiled a list of places motorists may wish to avoid. That's for today through Aug. 23, 2025.
City Construction Projects
Joe B Jackson Pkwy at WB I-24 On-Ramp Improvement Work Expected Lane Closure: Monday, 4/21 through Monday, 9/8: Contractor for a private development will be making I-24 ramp improvements. EB and/or WB traffic on Joe B Jackson will be reduced from two lanes to one lane. Appropriate traffic controls will be in place.
Manson Pike/Burnt Knob Rd and Blackman Rd Intersection Improvement Work Expected Lane Closure: Monday through Friday: BE ALERT FOR NEW TRAFFIC AND SIGNAL PATTERNS. City Contractor will be performing roadway widening work at the intersection. There will be lane shifts and traffic interruptions.
Manchester Pike between Red Mile and Pear Blossom A contractor for a private development will be doing road improvements. Manchester Pike may be reduced to one lane with flagging operation from 9:00 AM - 3:00 PM. Project start is 7/28 with a 1 month anticipated duration.
Town Creek Project Hickerson Dr, W Castle St, and S Front St to experience intermittent lane closures.
MTE Overhead Work Daily lane closures on S Church St near Warrior Dr.
City-Wide Google Fiber Installation Work
- Saint Andrews Dr
- Parkwood Dr
- Goose Creek Ln, Cason Ln, Leipers Ln, Parkwood Dr, Elmcroft Ave, Pepper Branch Dr, Kipling Ct
- Veterans Pkwy, Cason Ln, Leatherwood Dr, Bluestem Ln, Leipers Fork, Kellner Dr, Goose Creek Ln
- Shady Glen Cir, Spottswood Cir, Silver Springs Ct, Stow Xing, Belle Rives Dr, Anthem Way, Desoto Ct, United Dr, Belle Haven Dr, Aristocrate Dr, Saint Andrews Dr.
- Jerry Anderson Dr, Allerton Way, Butterfield Ave, Shady Forest Dr, Sweetbrian Ave, Capstone Dr, Pelham Wood Dr, Holderwood Dr, Community Cir, Saint Andrews Dr, Genoa Dr.
- Shady Forest Dr, Nature Dr, Dewington Dr, Geneva Dr, Shady Springs Dr, Dewdrop Ct, Beaulah Dr, Maddie Kate Ct, Stephanie Ct, Robinwood Dr
- Geneva Dr, Banyon Dr, Genoa Dr, Sagewood Ct, Robinwood Dr, Slater Dr, Beaulah Dr, Janell Trl, Saint Andrews Dr.
- Salem Creek Dr, Presley Dr, Thad Ct, Trevor Trl, Earline Way, Robinwood Dr
Expected Lane Closure: Monday through Saturday, 9:00 AM – 3:00 PM: Contractor for Google Fiber will be installing fiber optic lines. There will be lane closures and lane shifts. Appropriate traffic controls will be in place.
Annual City Street Paving, Roadway, and Miscellaneous Work
Expected Lane Closures: Monday through Friday, 9:00 AM – 3:00 PM: City contractor will be performing construction work at the following streets:
- Manson Pike/Burnt Knob Rd and Blackman Rd (intersection improvement work)
- Veterans Pkwy between Barfield Crescent Rd and Church St (sidewalk and curb repair)
- S Rutherford Blvd between Bradyville Pike and Manchester Pike (milling and other roadwork)
- 3200 block of Bilbrey (drainage improvements)
- St Andrews Dr between New Salem Hwy and Salem Cove Ln (sidewalk and curb repair)
- Greenland Dr between Old Lascassas Rd and Champion Way (striping)
- Willowbrook Dr at N Rutherford Blvd (striping)
Expect lane shifts and traffic interruptions. Appropriate traffic controls will be in place.
TDOT Resurfacing Projects
RUTHERFORD COUNTY I-840
Resurfacing I-840 from Jefferson Pike (SR 266) to Wilson County Line.
Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-840 in both directions for final pavement marking and work on shoulders and roadway (MM 61 – 66).
RUTHERFORD COUNTY SR 2 The resurfacing on SR 2 (US-41) from Kensington Square Court to south of Cedar Grove Road.
· Daily, 9 a.m. – 3 p.m., There will be temporary alternating lane closures in both directions (MM 1.8 – 6.78). Flagging operations will be in place and one lane will remain open at all times.
RUTHERFORD COUNTY I-24 The I-24 ramp improvements at US 231 (SR 10/South Church Street/Exit 81) in Murfreesboro.
· Nightly, 8 p.m. – 5 a.m., There will be alternating single lane closures westbound and alternating double lane closures westbound on I-24 for installation of traffic control for media barrier work (MM 81).
Source: TDOT

